E-mail or call us See our entire site at a glance Licensor of UNI Pavers Search our Site UNI Members Only UNI-GROUP U.S.A. Manufacturers of UNI Paving Stones

CASE STUDIES

The following case studies are available from UNI-GROUP U.S.A. or your local UNI® Manufacturer. If you'd like to order printed versions of the case studies shown, click here to send an electronic form request or visit our PDF downloads page for those available in digital format. Additional case studies are currently being produced. Check back with us from time to time for new issues.

ECO-STONE FAMILY OF PERMEABLE PAVEMENTS
MULTI-PROJECT CASE STUDY - NEW!

With millions of square feet of UNI Permeable pavers installed across the United States and Canada since 1989, UNI-GROUP U.S.A. manufacturers' projects offer proven performance for all types of applications - residential, commercial, municipal and industrial. From large-scale projects such as Buckingham Fountain and U.S. Cellular Field in Chicago to private residences, this brochure offers a cross-section of permeable pavements that are in use - both newly installed and those that have been in use for over 15 years. Download here.

24-pages pages. full color - 2010 - Updated in 2012 with additional projects.


Westmoreland StreetWESTMORELAND STREET PORTLAND ECOLOC CASE STUDY


In November of 2004, a pilot project to install Ecoloc® permeable interlocking concrete pavement (PICP) in the 80-year old Westmoreland neighborhood was undertaken as part of a joint project by the Portland Office of Transportation, Bureau of Environmental Services, and the Portland Water Bureau. The project  will test how well PICP performs on a public residential street. The project will provide data on durability, drainage capabilities of the Ecoloc® pavement, and maintenance requirements.

Two pages. full color - 2008



Jordan Cove
JORDAN COVE ECO-STONE CASE STUDY


This project is part of the EPA's Section 319 National Monitoring Program that addresses non-point source pollution. It is the only NMP project in the country to study the impact of residential development on stormwater runoff quantity and quality, as well as management practices used to manage the runoff. The neighborhood utilizes a number of BMP practices including grass swales, vegetated bio-retention areas, roof leader rain gardens, street sweeping, and fertilizer and pesticide management. The project's cul-de-sac, reduced-width street and some of the driveways are paved with permeable UNI Eco-Stone® pavers.

Six pages, full color - 2005



Sterling Sugar Refinery
STERLING SUGAR REFINERY CASE STUDY


Industrial container storage facility featuring UNI-Anchorlock® concrete pavers. Information includes design details and specifications, and materials selection. The UNI-Anchorlock® pavers provided a flexible pavement surface capable of accommodating the poor, weak clay soils at the site, while withstanding industrialized loads.

Two pages, full color - 1999






Bend Oregon"THE VILLAGE," BEND, OREGON CASE STUDY


Streetscape renovation project featuring UNI-Decor® concrete pavers. The city of Bend, Oregon, experiences some of the most extreme climate changes in the country, with over 350 freeze-thaw cycles per year. This study includes design details and specifications, materials selection, climate data, and maintenance history for the project.

Two pages, full color - 1998






Port of TampaPORT OF TAMPA CASE STUDY

Industrial port application with UNI-Anchorlock® interlocking concrete pavers. Details include design selection process, facilities description, design loads, materials selection, and mechanized installation information for the cargo staging area at Berth 208 in the Port of Tampa, Florida.

Four pages, full color - 1998






Rio Vista
RIO VISTA WATER TREATMENT PLANT CASE STUDY

Municipal parking lot application with UNI Eco-Stone® permeable interlocking concrete pavers. Design details and product specifications are highlighted with emphasis on water conservation and the environment for a project by the Castaic Lake Water Agency for their new water treatment plant and Water Conservatory Garden and Learning Center.

Two pages, full color - 1998





Mickel Field Highlands Park
MICKEL FIELD AND HIGHLANDS PARK CASE STUDY

Municipal parking lot renovation with UNI Eco-Stone® permeable concrete pavers. Poor drainage conditions and concern for the environment spurred the City of Wilton Manors, Florida, to use UNI Eco-Stone® for their parking lot renovation project to control runoff, and provide a durable surface for vehicular traffic.

Two
pages, full color - 1997







Kansas I-35KANSAS INTERSTATE HIGHWAY I-35 SLOPE CASE STUDY

Municipal application utilizing UNI-Decor® for embankment reconstruction at the inter- changes at Johnson Drive and 67th Street in the city of Merriam, in Johnson County, Kansas, as part of the Interstate Highway 35 Corridor improvements project. Included are project design details, engineering drawings, and product details.

Four
pages, full color - 1993






Pier IXPIER IX CASE STUDY

Industrial port application for coal storage and transfer with UNI-Stone® pavers installed in 1982 at Pier IX Terminal in Newport News, Virginia. Information includes facilities description, analysis of pavement alternatives, design loads, materials selection, and a 1990 evaluation of the pavement by noted pavement authorities Raymond and Marian Rollings, Ph.D., P.E.

Four pages, full color - 1991

E-MAIL   |   HOME   |   SITEMAP
© 1998-2013 UNI-GROUP U.S.A. All rights reserved.